Network Maintenance in France

Client: RTE France
Lines:63-90-150-225-400 kV

Context

The French electricity grid is one of the largest and most extended in Europe. Its position renders it a compulsory step in European energy trading and an operational hub in the continental interconnection project.
Since 2010, SELT has collaborated in ensuring the network’s efficiency through restructuring high voltage overhead lines in sites across the country.

Context

The Main Challenge

France represents an international point of reference for safety and environmental policies. The project requires the highest professional standards, in consideration of numerous local regulations.
Careful observance of these rules permits the execution of otherwise risky operations such as the maintenance ofalternately deactivated double circuit lines.
The dynamic international character of our staff ensured the quick adoption of local procedures, making SELT a reliable partner for RTE France.

A Resilient Team

The ability to quickly adapt to varied working conditions is a quality that has always marked out our staff. The continuous training process followed at every level guarantees an immediate reaction to any and all technical difficulties.
The project carried out in France is proof that a flexible approach transforms cultural diversity into opportunities for professionalisation.

A Resilient Team

Key Points

Works on lines between 63 and 400 kV
Adjustment and reinforcementof pylons
Replacement of equipment
Replacement of conductors and shield wires
1,200 km of lines restructured

Key Points

GET IN TOUCH

SELT SpA
Operational headquarter: Via Londra, 8 - 10 Zona PIP 09094 Marrubiu (OR)
Phone +39-0783/856059
Fax +39-0783/856282
E-Mail selt@seltspa.com - selt@pec.seltspa.com

POR FESR