Transmission Network Maintenance in France

The Context
France operates one of Europe’s largest and most extensive electricity transmission networks. Its strategic location also makes it a key hub for cross-border energy exchanges and an essential part of the European interconnected power system.
Since 2010, SELT has supported the efficiency and reliability of the French transmission network through the refurbishment of high-voltage overhead transmission lines, with projects carried out across the country.
The Challenge
France applies some of the world’s most demanding health, safety and environmental standards for transmission infrastructure projects. Delivering these works requires strict compliance with national regulations and consistently high levels of technical expertise.
These standards enable complex maintenance activities to be carried out safely, including work on double-circuit transmission lines where one circuit remains in service while the other is taken out of operation.
SELT’s international experience and the adaptability of its workforce have enabled the company to quickly integrate local procedures and establish itself as a reliable partner for RTE France.
A Resilient Team
The ability to adapt quickly to different working environments has always been one of SELT’s strengths. Continuous technical training enables our teams to respond effectively to the challenges of complex transmission infrastructure projects.
Our long-standing presence in France demonstrates how technical expertise, operational flexibility and international collaboration contribute to successful project delivery.
Project Highlights
- Works on transmission lines from 63 kV to 400 kV
- Tower upgrading and reinforcement
- Replacement of transmission line equipment
- Replacement of conductors and overhead earth wires
- 1,200 km of transmission lines refurbished