Our projects
Field experience, concrete results
SELT is a key player in the construction and expansion of major European energy infrastructures, with over 5,000 km of network built and work on lines up to 420 kV.
Our experience extends to HV/MV electrical substations and connection systems for renewable energy plants, operating in diverse geographical and technical contexts where precision execution is a primary requirement.
The following projects demonstrate our ability to act as a single EPC partner, ensuring direct oversight of each phase and the stability of strategic projects for the energy transition.
HV Underground Cable Connection
Giannutri Solar Project
Ittiri–Codrongianos Transmission Line
Pozzallo Photovoltaic Plants
Malta–Sicily Interconnector (Onshore)
Tilburg – 380 kV Grid Development
Trento HV Grid Rationalisation
Karalis 220 kV Grid Connection Substation
Central Norway Transmission Lines
Transmission Network Maintenance in France
Molentargius Underground Transmission Line
San Bellino Solar Park
Sandalia Solar Farm – Sonnedix
Nurra Wind Farm
150 kV Lula–Galtellì Underground Transmission Line – Terna Rete Italia S.p.A.






